Rating Criteria
The lists below show the rating criteria that have been applied to each Standard Performance Measure (SPM) in order to measure whether a country government or a development partner was able to achieve the respective target i.e. for IHP+Results to be able to apply a rating in form of a symbol (as shown in the tables).
The tables show the indicator number, the overall target, and the respective criteria that determine which rating has been given in the scorecards.
Please follow the links below in order to see the table for:
Click here for a detailed description of the methodology used in the IHP+Results 2010 Monitoring.
For IHP+ Country Governments
For IHP+ Development Partners